Shixiang Road Viaduct, a major highway located in the northern part of Hangzhou, China, was opened to traffic on 7th July, 2016.
The total length of the viaduct is 6.47 km, four-lane two-way elevated above the road.
Construction of the viaduct took one and a half year, and the opening of this highway had remarkably eased traffic flow.
There were a total of 21 sets of Super-Cell Super Cells of various specifications applied to the project for bi-directional loading tests, including:
- Diameter of the pile: 1.5m~2.5m (59in~98in)
- Max load test: 1,600 kN~4,400 kN (360 kip~989 kip)
- Quantity of pile: 21pcs